CAPITAL PROJECTS
Quick Links
Capital Project Schedule and Alternates Update
BID SCHEDULE:
Bid Distribution Thursday, November 30, 2023
Pre-Bid Meeting Tuesday, December 12, 2023 @ 2:00 pm
Bid Opening Tuesday, January 9, 2024 @3:30 pm
Award Monday, January 22, 2024 *Special Board Meeting, if possible
PROPOSED ALTERNATES:
SITE:
Bostwick – Grass Field (Base Bid), Turf (Alternate)
Bostwick – Field Lighting, 4 Light Poles (Base Bid), 6 Light Poles (Alternate)
Bostwick – Baseball Backstop
Bostwick – Stone Parking Lots (Base Bid), Pavement (Alternate)
Bostwick – 500 Seat Bleachers (Base Bid), 750 Seats (Alternate)
Bus Garage Civil/Site Upgrades
Replace Sanitary Line from High School to State Street
GENERAL CONSTRUCTION / MECHANICAL / PLUMBING / ELECTRICAL:
Bus Garage HVAC
Recover Roof at Main Gym
Recover Roof at North Classroom Wing
Replace Wood Floor in Main Gym
Add Toilet Rooms Outside of K-4 Gym
Replace Domestic Water Heaters
Fire Alarm System (alternate to get Notifier system in case contractor submits equivalent)
Capital Project 2022 (From September 2022 Newsletter)
The Lowville Academy and Central School District has a responsibility to maintain and improve its facilities in order to provide a safe and efficient learning environment for our students. Over the past several months, the Board of Education and Central Administration have engaged in thoughtful planning with our architects, March Associates (Boonville). We take great pride in our school and the clean, safe conditions we are able to provide for our students and community. Much like your own home improvements, it is important to us to continually make improvements to provide these conditions. In the case of our upcoming public referendum, voters will be asked to support a Capital Project to improve basic infrastructure, roofs, sidewalks and pavement, and update selected instructional spaces.
On Tuesday, October 25, 2022, Lowville Academy and Central School district residents will have the opportunity to vote on a proposition regarding our proposed capital improvement project. This project seeks to address a number of needs for our students. Included in the referendum is authorization to acquire additional property adjacent to the school campus for added space and future growth of the district.
Because of our role as responsible stewards of taxpayer dollars, this project will have no tax impact on our community. Through the use of a Capital Reserve, a state reimbursement rate of almost 89%, and through other available funds, this project will have no tax impact on our community.
There will be a public information session held on Wednesday, October 12, 2022 at 6:30 in the elementary cafeteria to discuss the details of the project. Additionally, information booths will be available at each of our buildings’ open house events as well as Homecoming Weekend.
Thank you for your outstanding support of the students and educational programs of Lowville Academy.
Capital Project Details
Project Referendum Amount: $14,900,000
Project Locations: Bus Garage, School Building & Bostwick Street Fields
Project Cost Impact On Taxpayers: No Additional Taxes
Scope of Work
School Building:
Renovate Elementary Classroom Bathrooms for Handicapped Access
Sanitary Systems Upgrades
Fire Alarm Upgrades
HVAC System Upgrades
Replace Turf In Athletic Field
Roof Replacement in Various Areas
Replace Gym Wood Floor (1955)
Upgrade Pool Main Drain Lines
Obsolete HVAC
Wrestling Room Restroom
Drainage Pipe Drawing
Bus Garage:
Improve Drainage Behind Building
HVAC Upgrades
Bostwick Street Fields:
Construct Eight Lane Track with Grass Soccer Field
Reposition Softball Field
Reconstruct & Expand Parking Lots
Purchase Property on Bostwick Street & Construct Additional Parking Lot (Separate Proposition)
Existing Site Plan
Proposed Site Plan