Capital Project Schedule and Alternates Update

BID SCHEDULE:

Bid Distribution Thursday, November 30, 2023
Pre-Bid Meeting Tuesday, December 12, 2023 @ 2:00 pm
Bid Opening Tuesday, January 9, 2024 @3:30 pm
Award Monday, January 22, 2024 *Special Board Meeting, if possible

PROPOSED ALTERNATES:

SITE:

  • Bostwick – Grass Field (Base Bid), Turf (Alternate)

  • Bostwick – Field Lighting, 4 Light Poles (Base Bid), 6 Light Poles (Alternate)

  • Bostwick – Baseball Backstop

  • Bostwick – Stone Parking Lots (Base Bid), Pavement (Alternate)

  • Bostwick – 500 Seat Bleachers (Base Bid), 750 Seats (Alternate)

  • Bus Garage Civil/Site Upgrades

  • Replace Sanitary Line from High School to State Street

GENERAL CONSTRUCTION / MECHANICAL / PLUMBING / ELECTRICAL:

  • Bus Garage HVAC

  • Recover Roof at Main Gym

  • Recover Roof at North Classroom Wing

  • Replace Wood Floor in Main Gym

  • Add Toilet Rooms Outside of K-4 Gym

  • Replace Domestic Water Heaters

  • Fire Alarm System (alternate to get Notifier system in case contractor submits equivalent)

Capital Project 2022 (From September 2022 Newsletter)
The Lowville Academy and Central School District has a responsibility to maintain and improve its facilities in order to provide a safe and efficient learning environment for our students. Over the past several months, the Board of Education and Central Administration have engaged in thoughtful planning with our architects, March Associates (Boonville). We take great pride in our school and the clean, safe conditions we are able to provide for our students and community. Much like your own home improvements, it is important to us to continually make improvements to provide these conditions. In the case of our upcoming public referendum, voters will be asked to support a Capital Project to improve basic infrastructure, roofs, sidewalks and pavement, and update selected instructional spaces. 

On Tuesday, October 25, 2022, Lowville Academy and Central School district residents will have the opportunity to vote on a proposition regarding our proposed capital improvement project.  This project seeks to address a number of needs for our students. Included in the referendum is authorization to acquire additional property adjacent to the school campus for added space and future growth of the district.

Because of our role as responsible stewards of taxpayer dollars, this project will have no tax impact on our community. Through the use of a Capital Reserve, a state reimbursement rate of almost 89%, and through other available funds, this project will have no tax impact on our community.

There will be a public information session held on Wednesday, October 12, 2022 at 6:30 in the elementary cafeteria to discuss the details of the project. Additionally, information booths will be available at each of our buildings’ open house events as well as Homecoming Weekend.  

Thank you for your outstanding support of the students and educational programs of Lowville Academy.  

Capital Project Details
Project Referendum Amount: $14,900,000
Project Locations: Bus Garage, School Building & Bostwick Street Fields
Project Cost Impact On Taxpayers: No Additional Taxes

Scope of Work

School Building:

  • Renovate Elementary Classroom Bathrooms for Handicapped Access

  • Sanitary Systems Upgrades

  • Fire Alarm Upgrades

  • HVAC System Upgrades

  • Replace Turf In Athletic Field

  • Roof Replacement in Various Areas

  • Replace Gym Wood Floor (1955)

  • Upgrade Pool Main Drain Lines

Obsolete HVAC

Obsolete HVAC

Wrestling Room Restroom

Restroom

Drainage Pipe Drawing

Pipes

Bus Garage:

  • Improve Drainage Behind Building

  • HVAC Upgrades

Bostwick Street Fields:

  • Construct Eight Lane Track with Grass Soccer Field

  • Reposition Softball Field

  • Reconstruct & Expand Parking Lots

  • Purchase Property on Bostwick Street & Construct Additional Parking Lot (Separate Proposition)